In which year the construction of Vidyasagar Setu was completed

  1. 1985
  2. 1989
  3. 1990
  4. 1992

Answer: 1992

Explanation: The Hooghly River Bridge Commission (HRBC) was responsible for the commissioning operations of the bridge. Construction began on 3 July 1979, and the bridge was commissioned on 10 October 1992 by the Hooghly River Bridge Commission.