Five jobs (J1, J2, J3, J4 and J5) need to be processed in a factory. Each job can be assigned to any of the five different machines (M1, M2, M3, M4 and M5)

Q. Five jobs (J1, J2, J3, J4 and J5) need to be processed in a factory. Each job can be assigned to any of the five different machines (M1, M2, M3, M4 and M5). The time durations taken (in minutes) by the machines for each of the jobs, are given in the table. However, each job is assigned to a specific machine in such a way that the total processing time is minimum. The total processing time is ____________minutes.

 M1M2M3M4M5
J14030505058
J22638602638
J34034282430
J42840403248
J52832382244

Ans:

Subtracting minimum value of each row from corresponding row elements.

M1M2M3M4M5
J1100202028
J201234012
J31610406
J401212420
J561016022

Subtracting minimum value of each column from corresponding column.

Now Number of assignments is less than the number of machines. Hence current solution is not optimal. Now adding minimum uncovered value at all junctions and subtracting from uncovered values.

Hence,

Job 1 → Machine 2

Job 2 → Machine 5

Job 3 → Machine 3

Job 4 → Machine 1

Job 5 → Machine 4

Total time = 30 + 38 + 28 + 28 + 22 = 146

Take Mock Tests

Government Schemes Mock Test Start Test!
Political Science Mock Test – 42 Start Test
History Test – 190 Start Test
Quantitative Aptitude Test Start Test!
Data Interpretation - Mock Test Start Test!
General Awareness - Mock Test Start Test!
Reasoning Ability - Mock Test Start Test!
We will be happy to hear your thoughts

Leave a reply

Gkseries.com
Logo
Register New Account