A, B and C complete a work in 12,15 and 18 days respectively if they start work together till the whole work complete. Find the share of wages of A,B and C out of he total wages of 1443 Rs?
a)220,390,385
b) 285,390,362
c) 362,585,390
d) 585,468,390
Sol:
![](https://www.gkseries.com/blog/wp-content/uploads/2024/04/image-120-1024x434.png)
A + B + C = 37 → 1443
1 → 39.
A → 39 × 15 = 585
B → 39 × 12 = 468
C → 39 × 10 = 390