Arrange the following in the correct sequence of operations in an integrated steel plant

Arrange the following in the correct sequence of operations in an integrated steel plant

Q. Arrange the following in the correct sequence of operations in an integrated steel plant:

i. Basic Oxygen Furnace (BOF)

ii. Blast Furnace (BF)

iii. Ruhrstahl Heraeus Degassing Process (RH)

iv. Ladle Furnace Process (LF)

(A) BOFBFLFRH                             (B) BFLFBOFRH

(C) RHLFBFBOF                             (D) BFBOFLFRH

Ans: BFBOFLFRH