Q. Arrange the following in the correct sequence of operations in an integrated steel plant:

i. Basic Oxygen Furnace (BOF)

ii. Blast Furnace (BF)

iii. Ruhrstahl Heraeus Degassing Process (RH)

iv. Ladle Furnace Process (LF)

(A) BOFBFLFRH                             (B) BFLFBOFRH

(C) RHLFBFBOF                             (D) BFBOFLFRH

Ans: BFBOFLFRH