The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is
READ MORE +The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is
READ MORE +Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds
READ MORE +The value of ‘A’ of Indian type W.C. shown in the given figure is
READ MORE +The area is measured correct to the nearest
READ MORE +Pick up the incorrect statement from the following
READ MORE +Pick up the correct statement from the following
READ MORE +The cross -section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is
READ MORE +Pick up the correct statement regarding the centre line method of estimating a building
READ MORE +Pick up the incorrect statement from the following
READ MORE +Pick up the correct statement from the following
READ MORE +Pick up the correct statement from the following
READ MORE +For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is
READ MORE +