![___is a value-based system of inventory control, in which materials are analyzed according to their value so that costly and more valuable materials are given greater attention](https://www.gkseries.com/blog/wp-content/uploads/thumbs_dir/is-a-value-based-system-of-inventory-control-in-which-materials-are-analyzed-according-to-their-value-so-that-costly-and-more-valuable-materials-are-given-greater-attention-po0jdunrrqpw43b57nhxgc1ncpj8gnyuc71uqsro9s.png)
___is a value-based system of inventory control, in which materials are analyzed according to their value so that costly and more valuable materials are given greater attention
READ MORE +___is a value-based system of inventory control, in which materials are analyzed according to their value so that costly and more valuable materials are given greater attention
READ MORE +Which of the following is not correct for the calculation of the re-ordering level of inventory?
READ MORE +Which of the following is not a cost price method of pricing material issues?
READ MORE +The most suitable inventory control technique for spare parts is
READ MORE +During the time of inflation, the method of pricing of material issue which leads to a lower material cost for a job is
READ MORE +If the annual carrying cost of Material Z is ₹ 4 per unit and its total carrying cost is ₹ 12,000 p.a., the economic order quantity of material is:
READ MORE +Decision regarding the centralized purchase of material has to be taken on the basis of
READ MORE +The rate per kg of material P, Q, R & S are respectively ₹ 12,₹ 15,₹ 18 & ₹ 21. The input-output ratios of the material are 140%, 130%, 120% & 110% respectively. The most economical material for production is
READ MORE +This type of loss is connected with both input and output
READ MORE +In which of the following methods, material issues are priced at a predetermined rate?
READ MORE +Which of the following does not normally appear on a material requisition form?
READ MORE +Which of the following difference in material stock adjusted by considering as part of the material cost?
READ MORE +