4 men and 5 women can complete a work in 15 days, where as 9 men and 6 women can do it in 10 days. So in order to complete

4 men and 5 women can complete a work in 15 days, where as 9 men and 6 women can do it in 10 days. So in order to complete the same work in 7 days how many women should assist 8 men? (a)          14 (b)          12 (c)           11 (d)          13 Sol: Total work = (4M + 5W) × 15 = (9M + 6W) × 10 ...

READ MORE +
A pole is on the top of tower. The angle of depression from the pole and tower to the ground is 60° and 30° respectively

A pole is on the top of tower. The angle of depression from the pole and tower to the ground is 60° and 30° respectively at point P. It the distance between the point P and tower is 260√3m, find the height of pole. (a)          360m (b)          120m (c)           480m (d)          520m Sol: ...

READ MORE +