In a direct rope haulage operating along a 1500 m long incline

Q. In a direct rope haulage operating along a 1500 m long incline, 180 tonne of coal is hauled in 7 hours. The average rope speed is 7.5 km/h. The set changing time for the tubs is 2 minutes each at the top and bottom of the incline. If the tub capacity is 1.0 tonne, the number of tubs in the set is                                                                         .

Ans: 12.0-12.0

We will be happy to hear your thoughts

Leave a reply

Gkseries.com
Logo
Register New Account