The Union Minister of Road Transport & Highways, Nitin Gadkari reviewed the progress of India’s first grade separated urban expressway, Dwarka Expressway (NH – 248BB) .
Daily Current Affairs Quiz 2021
The Minister expressed hope that the 29-kilometre long Expressway, being constructed under the Bharatmala Project and with a cost of Rs.8,662 crore, would be completed before the Independence Day next year.
Being built in four packages, total length of the Expressway is 29 kilometres out of which 18.9 kilometre length falls in Haryana while remaining 10.1 kilometre length is in Delhi. It starts from Shiv-Murti on National Highway-8 and ends near KherkiDaula Toll Plaza.
Delhi-Gurugram section of National Highway-8, a part of Delhi-Jaipur-Ahmedabad-Mumbai arm of Golden Quadrilateral (GQ), is presently carrying traffic of over three lakh Passenger Car Units (PCUs). With the construction of the present project, 50 to 60 per cent traffic on National Highway-8 will be reduced.