India’s KAPS-4 Nuclear Plant Achieves Full Capacity

India’s KAPS-4 Nuclear Plant Achieves Full Capacity

The Kakrapar Atomic Power Station (KAPS) in Gujarat, India, has reached full operational capacity with its second 700 MW nuclear reactor, KAPS-4, which started operating at full power on August 21, 2024. This achievement follows the reactor’s commercial operation start on March 31, 2024, and its first criticality on December 17, 2023. The Nuclear Power Corporation of India Limited (NPCIL) confirmed that Unit 4 at KAPS was previously operating at 90% capacity before reaching its full 700 MW output.

Gkseries: Gkseries.com is a premier website to provide complete solution for online preparation of different competitive exams like UPSC, SBI PO, SBI clerical, PCS, IPS, IAS, IBPS PO, IBPS Clerical exam etc. & other graduate and post-graduate exams. Learn more on about us page