Q. The arc lengths of a directed graph of a project are as shown in the figure. The shortest path length from node 1 to node 6 is
Ans: 7
Sol:
Q. The arc lengths of a directed graph of a project are as shown in the figure. The shortest path length from node 1 to node 6 is
Ans: 7
Sol: