With reference to the Electricity (Transmission system Planning, Development and Recovery of Inter-State Transmission Charges) Rules 2021, consider the following statements:
With reference to the Electricity (Transmission system Planning, Development and Recovery of Inter-State Transmission Charges) Rules 2021, consider the following statements:
1. It empowers state power distribution and transmission companies to determine their transmission requirements and build them.
2. The Central Electricity Authority shall prepare a short-term plan every year on rolling basis for next 5 years and perspective plan every alternative year on rolling basis for next 10 years.
Which of the statements given above is/are correct?
A. 1 Only
B. 2 Only
C. Both 1 & 2
D. None
Answer: Both 1 & 2
Explanation:
The Union Ministry of Power has promulgated the Electricity (Transmission System Planning, Development and Recovery of Inter-State Transmission Charges) Rules, 2021.
The rules under pir a system of transmission access which is termed as a General Network Access in the inter-state transmission system.
This provides flexibility to the state as well as the generating stations to acquire, hold and transfer transmission capacity as per their requirement.
UPSC Daily Current Affairs Quiz Test 5 October 2021 Click Here