Marathwada Rail Coach Factory is going to contribute in overall development of this region of Maharashtra.
Article and Schedule Quiz | Start Test! |
This factory has been designed with an initial capacity of manufacturing 250 MEMU / EMU / LHB / trainset type advanced coaches per annum.
A 5 km long rail connectivity has been provided for movement of coaches from the factory to a new electronically interlocked Harangul railway station, which earlier used to be only a halt station.