1 The probability of completing the project can be estimated based upon the ____ .
A Uniform distribution curve
B Normal distribution curve.
C U-shaped distribution curve
D None of the above

Answer:Normal distribution curve.
2 In the initial stage of the project the probability of completing the project is ___ .
A Zero
B High
C Low
D Any of the above

Answer: Low
Advertisement
Article and Schedule Quiz Start Test!
DOWNLOAD CURRENT AFFAIRS PDF FROM APP
3 The entire process of a project may be considered to be made up on number of sub process placed in different stage called the
A Technical key resources
B Work key structure
C Work Breakdown Structure (WBS).
D None of the above

Answer: Work Breakdown Structure (WBS).
4 Tool used for comparison of the proposed project to complete projects of a similar nature whose costs are known.
A Algorithmic model
B Expert judgment
C Top down
D Analogy

Answer: Analogy
5 Each component of the software product is separately estimated and the results aggregated to produce an estimate for the overall job.
A Algorithmic model
B Expert judgment
C Bottom-up
D Top down

Answer:Bottom-up
6 Following is (are) the component(s) of risk management
A Risk Assessment
B Risk Control
C Risk Ranking
D All of the above

Answer: All of the above
7 Following are the characteristics of Project Mindset.
A Time, Responsiveness, Information sharing, Processes, structured planning
B Time, Project management, Information sharing, Processes, structured planning
C Time, Responsiveness, Information sharing, capability, structured planning
D Time, Responsiveness, Information sharing, Processes, project planning

Answer:Time, Responsiveness, Information sharing, Processes, structured planning
8 “Devising and maintaining a workable scheme to accomplish the business need” is
A Initiating process
B Planning process
C Executing process
D Controlling process

Answer: Planning process
9 Controlling the changes in the project may affect
A The progress of the project
B Stage cost
C Project scope
D All of the above

Answer: All of the above
10 Following is (are) the tool(s) for changing a process
A Change Management System (CMS)
B Configuration Management (CM)
C Both (A) and (B)
D None of the above

Answer:Both (A) and (B)