41
Which among the following is not correctly matched?
Answer: Kallada irrigation Scheme – Tamilnadu
Answer: Kallada irrigation Scheme – Tamilnadu
Answer: Koel Karo Project – Bihar
I. It was constructed to prevent floods, to supply hydro-electric power to Bihar and West Bengal, to have a canal for navigation and to supply water for irrigation.
II. It is designed on the lines of the Tennessee Valley Authority (T.V.A.) in U.S.A.
Which of the above statement (s) is/are correct about Damodar Valley Multipurpose Project?Answer: Both I and II
Answer: Ken-Betwa Link Project
Answer: Rihand Dam Project
Answer: Hirakund Dam - Narmada River
Answer: Hirakund Dam
Answer: Bhakhra Dam
Answer: Damodar Valley Project
Answer: Ukai Project
Answer: Almatti Dam