Download PDF
Free download in PDF Manual Testing Multiple Choice Questions and Answers for competitive exams. These short objective type questions with answers are very important for Board exams as well as competitive exams. These short solved questions or quizzes are provided by Gkseries.
(1)
Retesting of a single program or component after a change has been made?
[A]
Unit Regression
[B]
Retesting
[C]
Regional Regression
[D]
Full Regression Testing
(2)
Name the events that will be analyzed, Count the named incidents, Rank the count by frequency using a bar chart & Validate reasonableness of the analysis is called as
[A]
Pie Charts
[B]
SWOT Analysis
[C]
Pareto Analysis
[D]
Cause and Effect Diagram
(3)
White box testing is not called as___________
[A]
Clear box testing
[B]
OPen box testing
[C]
Closed box testing
[D]
Glass box testing
Answer: Closed box testing
(4)
It measures the quality of processes used to create a quality product. It is a system of management activities, It is a preventive process, It applies for entire life cycle & Deals with Process.
[A]
Quality Control
[B]
Quality Assurance
[C]
Verification
[D]
Validation
Answer: Quality Assurance
(5)
What are the Testing Levels?
[A]
System Testing and Acceptance Testing.
[B]
Integration Testing
[C]
Unit Testing
[D]
All the above
(6)
A Non-Functional Software testing done to check if the user interface is easy to use and understand
[A]
Security Testing
[B]
Unit testing
[C]
Block Box Testing
[D]
Usability Testing
Answer: Usability Testing
(7)
It is a set of levels that defines a testing maturity hierarchy
[A]
TMM (Testing Maturity Model)
[B]
TQM(Total Quality Management)
[C]
TIM (Testing Improving Model)
[D]
All of the above
Answer: TMM (Testing Maturity Model)
(8)
To check whether we have developed the product according to the customer requirements r not. It is a Dynamic process.
[A]
Quality Control
[B]
Quality Assurance
[C]
Validation
[D]
Verification
(9)
To check whether we are developing the right product according to the customer requirements are not. It is a static process
[A]
Verification
[B]
Quality Control
[C]
Quality Assurance
[D]
Validation
(10)
Executing the same test case by giving the number of inputs on same build called as
[A]
Sanity Testing
[B]
Ad hoc Testing
[C]
Regression Testing
[D]
ReTesting
(11)
The approach/document used to make sure all the requirements are covered when writing test cases
[A]
Traceability Matrix
[B]
Test bed
[C]
Checklist
[D]
Test Matrix
Answer: Traceability Matrix
(12)
The Switch is switched off once the temperature falls below 18 and then it is turned on when the temperature is more than 21. Identify the Equivalence values which belong to the same class.
[A]
22,23,24
[B]
14,15,19
[C]
24,27,17
[D]
12,16,22
(13)
Handover of Test-ware is a part of which Phase
[A]
Test Closure Activities
[B]
Evaluating exit criteria and reporting
[C]
Test Planning and control
[D]
Test Analysis and Design
Answer: Test Closure Activities
(14)
Which of the following items would not come under Configuration Management?
[A]
live data
[B]
user requirement document
[C]
test documentation
[D]
operating systems
(15)
Reporting Discrepancies as incidents is a part of which phase :-
[A]
Evaluating exit criteria and reporting
[B]
Test Closure Activities
[C]
Test Analysis and Design
[D]
Test Implementation and execution
Answer: Test Implementation and execution
(16)
Reviewing the test Basis is a part of which phase
[A]
Evaluating exit criteria and reporting
[B]
Test Closure Activities
[C]
Test Analysis and Design
[D]
Test Implementation and execution
Answer: Test Analysis and Design
(17)
One of the fields on a form contains a text box which accepts alpha numeric values. Identify the Valid Equivalence class
[A]
Boo01k
[B]
book
[C]
Book
[D]
BOOK
(18)
Static analysis is best described as:
[A]
The analysis of program code.
[B]
The use of black box testing.
[C]
The reviewing of test plans.
[D]
The analysis of batch programs.
Answer: The analysis of program code.
(19)
Testing activity which is performed to expose defects in the interfaces and in the interaction between integrated components is :-
[A]
Integration Level Testing
[B]
Component Testing
[C]
System Level Testing
[D]
Unit Level Testing
Answer: Integration Level Testing
(20)
Testing where in we subject the target of the test , to varying workloads to measure and evaluate the performance behaviors and ability of the target and of the test to continue to function properly under these different workloads.
[A]
Usability Testing
[B]
System Testing
[C]
Load Testing
[D]
Integration Testing
Please share this page