(1)
The basic difference between MRP and MRP-II is:
Answer: Finance
Answer: Finance
Answer: calculate net requirements
Answer: insensitive
Answer: all of the mentioned
Answer: finance
Answer: 500
Answer: Quality Assurance and Quality control
Answer: Quality control
Answer: Verification
Answer: Process capabilities should be monitored on intermittent basis
Answer: New Delhi
Answer: during production
Answer: little inspection
Answer: planning
Answer: All of the above
Answer: it may difficult to repeat the test
Answer: testing
Answer: quality planning
Answer: SQA team
Answer: errors