GkSeries.com

Project Management Exam Questions and Answers | Project Management MCQs

(1) The probability of completing the project can be estimated based upon the ____ .
[A] Uniform distribution curve
[B] Normal distribution curve.
[C] U-shaped distribution curve
[D] None of the above
Answer: Normal distribution curve.
(2) In the initial stage of the project the probability of completing the project is ___ .
[A] Zero
[B] High
[C] Low
[D] Any of the above
Answer: Low

DOWNLOAD CURRENT AFFAIRS PDF FROM APP

(3) The entire process of a project may be considered to be made up on number of sub process placed in different stage called the
[A] Technical key resources
[B] Work key structure
[C] Work Breakdown Structure (WBS).
[D] None of the above
Answer: Work Breakdown Structure (WBS).
(4) Tool used for comparison of the proposed project to complete projects of a similar nature whose costs are known.
[A] Algorithmic model
[B] Expert judgment
[C] Top down
[D] Analogy
Answer: Analogy
(5) Each component of the software product is separately estimated and the results aggregated to produce an estimate for the overall job.
[A] Algorithmic model
[B] Expert judgment
[C] Bottom-up
[D] Top down
Answer: Bottom-up
(6) Following is (are) the component(s) of risk management
[A] Risk Assessment
[B] Risk Control
[C] Risk Ranking
[D] All of the above
Answer: All of the above
(7) Following are the characteristics of Project Mindset.
[A] Time, Responsiveness, Information sharing, Processes, structured planning
[B] Time, Project management, Information sharing, Processes, structured planning
[C] Time, Responsiveness, Information sharing, capability, structured planning
[D] Time, Responsiveness, Information sharing, Processes, project planning
Answer: Time, Responsiveness, Information sharing, Processes, structured planning
(8) “Devising and maintaining a workable scheme to accomplish the business need” is
[A] Initiating process
[B] Planning process
[C] Executing process
[D] Controlling process
Answer: Planning process
(9) Controlling the changes in the project may affect
[A] The progress of the project
[B] Stage cost
[C] Project scope
[D] All of the above
Answer: All of the above
(10) Following is (are) the tool(s) for changing a process
[A] Change Management System (CMS)
[B] Configuration Management (CM)
[C] Both (A) and (B)
[D] None of the above
Answer: Both (A) and (B)

Please share this page

Click Here to Read more questions

Teacher Eligibility Test