(1) A ____ is a set of activities which are networked in an order and aimed towards achieving the goals of a project.
[A] Project
[B] Process
[C] Project management
[D] Project cycle
Answer: Project
(2) Resources refers to
[A] Manpower
[B] Machinery
[C] Materials
[D] All of the above
Answer: All of the above

DOWNLOAD CURRENT AFFAIRS PDF FROM APP

(3) Developing a technology is an example of
[A] Process
[B] Project
[C] Scope
[D] All of the above
Answer: Project
(4) The project life cycle consists of
[A] Understanding the scope of the project
[B] Objectives of the project
[C] Formulation and planning various activities
[D] All of the above
Answer: All of the above
(5) Following is(are) the responsibility(ies) of the project manager.
[A] Budgeting and cost control
[B] Allocating resources
[C] Tracking project expenditure
[D] All of the above
Answer: All of the above
(6) Following are the phases of Project Management Life Cycle. Arrange them in correct order

1.Design, 2. Marketing, 3. Analysis and evaluation, 4. Inspection, testing and delivery

[A] 3-2-1-4
[B] 1-2-3-4
[C] 2-3-1-4
[D] 4-3-2-1
Answer: 3-2-1-4
(7) Design phase consist of
[A] Input received
[B] Output received
[C] Both (A) and (B)
[D] None of the above
Answer: Both (A) and (B)
(8) Project performance consists of
[A] Time
[B] Cost
[C] Quality
[D] All of the above
Answer: All of the above
(9) Five dimensions that must be managed on a project
[A] Constraint, Quality, Cost, Schedule, Staff
[B] Features, Quality, Cost, Schedule, Staff
[C] Features, priority, Cost, Schedule, Staff
[D] Features, Quality, Cost, Schedule, customer
Answer: Features, Quality, Cost, Schedule, Staff
(10) Resorce requirement in project becomes constant while the project is in its _____ progress stage.
[A] 40 to 55%
[B] 55 to 70%
[C] 70 to 80%
[D] 80 to 95%
Answer: 80 to 95%