Questions
101 In the penetration macadam construction, the bitumen is
A sprayed after the aggregates are spread and compacted
B premixed with aggregates and then spread
C sprayed before the aggregates are spread and compacted
D none of the above

Answer: sprayed after the aggregates are spread and compacted
102 For the construction of water bound macadam roads, the correct sequence of operations after spreading coarse aggregates is
A dry rolling, wet rolling, application of screening and application of filler
B dry rolling, application of filler, wet rolling and application of screening
C dry rolling, application of screening, wet rolling and application of filler
D dry rolling, application of screening, application of filler and wet rolling

Answer: dry rolling, application of screening, wet rolling and application of filler
Advertisement
Article and Schedule Quiz Start Test!
DOWNLOAD CURRENT AFFAIRS PDF FROM APP
103 In highway construction, rolling starts from
A sides and proceed to centre
B centre and proceed to sides
C one side and proceed to other side
D any of the above

Answer: sides and proceed to centre
104 The binder normally used in flexible pavement construction is
A cement
B lime
C bitumen
D none of the above

Answer: bitumen
105 The camber of shoulders in water bound macadam roads is
A equal to the cross slope of pavement
B less than the cross slope of pavement
C greater than the cross slope of pavement
D zero

Answer: equal to the cross slope of pavement
106 The aggregates required for one kilometer length of water bound macadam road per meter width and for 10 mm thickness is
A 8 cubic meter
B 10 cubic meter
C 12 cubic meter
D 15 cubic meter

Answer: 12 cubic meter
107 The most suitable equipment for compacting clayey soils is a
A smooth wheeled roller
B pneumatic tyred roller
C sheep foot roller
D vibrator

Answer: sheep foot roller
108 Maximum daily traffic capacity of bituminous pavements is
A 500 tonnes per day
B 1000 tonnes per day
C 1500 tonnes per day
D 2000 tonnes per day

Answer: 1500 tonnes per day