Questions
1 The basic difference between MRP and MRP-II is:
A Finance
B Capacity Planning
C Bom
D Inventory

Answer: Finance
2 Bill of material structure is used to
A calculate man power requirements
B calculate due dates
C calculate net requirements
D all of the mentioned

Answer: calculate net requirements
Advertisement
Article and Schedule Quiz Start Test!
DOWNLOAD CURRENT AFFAIRS PDF FROM APP
3 CRP takes material requirements from MRP and converts to
A standard hours of load
B standard hours of machine
C standard hours of man power
D all of the mentioned

Answer: insensitive
4 Capacity planning is concerned with
A how much labour required
B how many machines required
C all of the mentioned
D none of the mentioned

Answer: all of the mentioned
5 MRP-II system is called a closed loop system because it considers
A finance
B man power
C inventory
D none of the mentioned

Answer: finance
6 For a small scale industry, the fixed cost per month is Rs. 5000. The variable cost per product is Rs. 20 and sales price is Rs. 30 per piece. The break even production per month will be
A 500
B 1000
C 300
D none of the above

Answer: 500
7 What does QA and QC stand for?
A Quality Adjustment and Queuing control
B Quality Assurance and Quality control
C Quality Adjustment and Quality completion
D Quality Assurance and Queuing Control

Answer: Quality Assurance and Quality control
8 Which of the following option involves material and component control?
A Quality control
B Feedback
C Development of standards
D Development of specification

Answer: Quality control
9 Which of the following is an example of QA?
A Validation
B Software testing
C Verification
D Documentation

Answer: Verification
10 Which of the following option is not correct regarding QA and QC?
A QA depends on the activities of the entire company
B Process capabilities should be monitored on intermittent basis
C Measuring equipment’s must have a calibration certificate
D Normally many inspections are done during the process of manufacturing

Answer: Process capabilities should be monitored on intermittent basis
11 Where the nodal point for National Measurement System is located?
A New Delhi
B Bombay
C Patna
D Bangalore

Answer: New Delhi
12 Process control is carried out
A during production
B after production control
C before production
D All of the above

Answer: during production
13 Low cost, higher volume items requires
A intensive inspection
B no inspection
C little inspection
D 100% inspection

Answer: little inspection
14 Faults are found most cost-effectively in which test activity?
A design
B planning
C Check Exit criteria completion
D execution

Answer: planning
15 Loop Testing methodology includes which of the following.
A Concatenated Loops
B Simple Loops
C Nested Loops
D All of the above

Answer: All of the above
16 What happened if an expected result is not specified then
A it may be difficult to determine if the test has passed or failed
B it may difficult to repeat the test
C we cannot run the test
D we cannot automate the user input values

Answer: it may difficult to repeat the test
17 Select which one is not an External failure costs?
A complaint resolution
B testing
C helpline support
D warranty work

Answer: testing
18 Select the option which is not an appraisal in SQA?
A inter-process inspection
B maintenance
C testing
D quality planning

Answer: quality planning
19 Select the people who identify the document and verifies the correctness of the software…
A SQA team
B Project team
C Project manager
D All of the mentioned

Answer: SQA team
20 Select what is the primary objective of formal technical reviews to find during the process so that after the release of the software they do not become the defect…
A faults
B errors
C failure
D none of the mentioned

Answer: errors