In the penetration macadam construction, the bitumen is
Answer: sprayed after the aggregates are spread and compacted
Answer: sprayed after the aggregates are spread and compacted
Answer: dry rolling, application of screening, wet rolling and application of filler
Answer: sides and proceed to centre
Answer: bitumen
Answer: equal to the cross slope of pavement
Answer: 12 cubic meter
Answer: sheep foot roller
Answer: 1500 tonnes per day