6 Risk analysis of a project is done in :
A System Analysis phase
B Feasibility Study
C Implementation phase
D Maintenance phase

Answer: Option [B]
7 In which step of SDLC project termination could be done ?
A Design phase
B System Maintenance phase
C Feasibility Study phase
D Coding phase

Answer: Option [C]
Advertisement
Article and Schedule Quiz Start Test!
DOWNLOAD CURRENT AFFAIRS PDF FROM APP
8 The fundamental objective of system analysis is to :
A understand computer hardware
B train managers in mathematical analysis
C study and understand a complex system and modify it in some way
D run simulation programmes

Answer: Option [C]
9 Which one of the following is not stage of SDLC ?
A System analysis
B Problem identification
C System Design
D Feasibility study

Answer: Option [B]
10 An iterative process of system development in which requirements are converted to a working system that is continually revised through close work between an analyst and user is called
A Waterfall modeling
B Iterative modeling
C Spiral modeling
D None of these above

Answer: Option [C]