11 The phase of System Development associated with creation of the test data is :
A System analysis
B Physical design
C System acceptance
D Logical design

Answer: Option [C]
12 Which of the following is not a named phase in the System development life cycle ?
A Assessment
B Maintenance
C Development
D Testing

Answer: Option [A]
Advertisement
Article and Schedule Quiz Start Test!
DOWNLOAD CURRENT AFFAIRS PDF FROM APP
13 Which of the following is a true statement regarding the SDLC phases ?
A The SDLC is not iterative
B The life cycle is always a sequentially ordered set of phases
C It is not possible to completed some activities in one phase in parallel with those of another phase
D The life cycle may be thought of a circular process

Answer: Option [A]
14 Which of the following is the most important phase of SDLC ?
A Requirements analysis
B Design
C Testing
D Coding

Answer: Option [A]
15 Which step of SDLC performs cost/ benefit analysis ?
A Feasibility study
B Analysis
C Design
D None of these above

Answer: Option [A]