Estimation and Costing MCQs | Estimation and Costing Multiple Choice Questions and Answers

Sports GK Questions and Answers 2024 (Latest Updated)

Awards & Honours GK Questions 2024 (Latest Updated)

Questions
1 The rate of an item of work depends on
A Proportion of mortar
B Specifications of materials
C Specifications of works
D All the above

Answer: All the above
2 The plinth area of a building not includes
A Lift and wall including landing
B Area of cantilevered porch
C Internal shaft for sanitary installations up to 2 sq m. in area
D Area of the walls at the floor level

Answer: Area of cantilevered porch
Advertisement
Article and Schedule Quiz Start Test!
DOWNLOAD CURRENT AFFAIRS PDF FROM APP
3 A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is
A 1500 m3
B 2000 m3
C 500 m3
D 1000 m 3

Answer: 1500 m3
4 The brick work is not measured in cu m in case of
A Half brick wall
B Reinforced brick work
C One or more than one brick wall
D Brick work in arches

Answer: Half brick wall
5 Pick up the correct statement from the following:
A The earth work of cutting in trenches or borrow pits in fairly uniform ground is measured with the help of average depths of the dead men
B The earth work in trenches or borrow pits in irregular ground is measured by taking the difference in levels before and after completion of work
C The earth work in trenches or borrow pits, where neither a nor b is feasible, are measured from the fillings after deduction of voids
D All the above

Answer: All the above
6 The cross -sections for a highway is taken at
A Intermediate points having abrupt change in gradient
B Right angle to the centre line
C 30 metres apart
D All the above

Answer: All the above
7 The area of the cross-section of a road fully in banking shown in the given figure, is
A [sb² + r² (2bd + sd)²]/(r – s)
B [sb² + r² (2bd + sd)²]/(r² – s5)
C [sb² + r² (2bd + sd)²]/(r² – s²)
D None of these

Answer: [sb² + r² (2bd + sd)²]/(r² – s²)
8 The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as
A Surface excavation
B Surface dressing
C Excavation
D Cutting

Answer: Surface excavation
9 For the construction of buildings, the subheads of the estimate are
A Brickwork Flooring, Wood work, Steel work
B Earthwork, Concrete work, Brick work
C Brickwork, Stone work, Roofing
D All the above

Answer: All the above
10 The expected out turn of 12 mm plastering with cement mortar is
A 8.0 sq m
B 2.5 sq m
C 4.0 sq m
D 6.0 sq m

Answer: 8.0 sq m
11 The measurement is made for stone work in square metre in case of
A Wall facing
B Columns, lintels, copings
C Building work
D A. and D. of the above

Answer: A. and D. of the above
12 The correct Prismoidal formula for volume is
A D/3 [first area + last area + 4 Even area + 2 odd areas]
B D/6 [first area + odd areas]
C D [first area + last area + Even area + 2 odd areas]
D None of above

Answer: D/3 [first area + last area + 4 Even area + 2 odd areas]
13 Pick up the incorrect statement from the following:
A Cubic contents are measured to the nearest 0.1 cum
B Weights are measured to the nearest 0.001 tonnes
C Dimensions are measured to the nearest 0.01 m
D Areas are measured to the nearest 0.01 sq.m

Answer: Cubic contents are measured to the nearest 0.1 cum
14 The order of booking dimensions is
A Height, breadth, length
B Breadth, length, height
C Length, breadth, height
D None of these

Answer: Length, breadth, height
15 period in a septic tank is assumed The detention
A 20 minutes
B 30 minutes
C 40 minutes
D None

Answer: 30 minutes
16 Pick up the item of work not included in the plinth area estimate
A Courtyard area
B Wall thickness
C Room area
D W.C. area

Answer: Courtyard area
17 Pick up the item whose weight is added to the weight of respective item, is
A Bolts
B Cleats
C Brackets
D All the above

Answer: All the above
18 The brick work is measured in sq metre, in case of
A Half brick walls or the partition
B Honey comb brick work
C Brick flat soling
D All the above

Answer: All the above
19 The item of steel work which is measured in sq.m, is
A Ventilators and glazing
B Rolling shutters
C Collapsible gates
D All the above

Answer: All the above
20 The volume is measured correct to the nearest
A 0.04 cum
B 0.02 cum
C 0.03 cum
D 0.01 cum

Answer: 0.01 cum

Random GK Questions

Assam Direct Recruitment Test Series

Teacher Eligibility Test

Assam Direct Recruitment Test Series