1 The rate of an item of work depends on
A Proportion of mortar
B Specifications of materials
C Specifications of works
D All the above

Answer: All the above
2 The plinth area of a building not includes
A Lift and wall including landing
B Area of cantilevered porch
C Internal shaft for sanitary installations up to 2 sq m. in area
D Area of the walls at the floor level

Answer: Area of cantilevered porch
Advertisement
Article and Schedule Quiz Start Test!

DOWNLOAD CURRENT AFFAIRS PDF FROM APP

3 A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is
A 1500 m3
B 2000 m3
C 500 m3
D 1000 m 3

Answer: 1500 m3
4 The brick work is not measured in cu m in case of
A Half brick wall
B Reinforced brick work
C One or more than one brick wall
D Brick work in arches

Answer: Half brick wall
5 Pick up the correct statement from the following:
A The earth work of cutting in trenches or borrow pits in fairly uniform ground is measured with the help of average depths of the dead men
B The earth work in trenches or borrow pits in irregular ground is measured by taking the difference in levels before and after completion of work
C The earth work in trenches or borrow pits, where neither a nor b is feasible, are measured from the fillings after deduction of voids
D All the above

Answer: All the above
6 The cross -sections for a highway is taken at
A Intermediate points having abrupt change in gradient
B Right angle to the centre line
C 30 metres apart
D All the above

Answer: All the above
7 The area of the cross-section of a road fully in banking shown in the given figure, is
A [sb² + r² (2bd + sd)²]/(r – s)
B [sb² + r² (2bd + sd)²]/(r² – s5)
C [sb² + r² (2bd + sd)²]/(r² – s²)
D None of these

Answer: [sb² + r² (2bd + sd)²]/(r² – s²)
8 The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as
A Surface excavation
B Surface dressing
C Excavation
D Cutting

Answer: Surface excavation
9 For the construction of buildings, the subheads of the estimate are
A Brickwork Flooring, Wood work, Steel work
B Earthwork, Concrete work, Brick work
C Brickwork, Stone work, Roofing
D All the above

Answer: All the above
10 The expected out turn of 12 mm plastering with cement mortar is
A 8.0 sq m
B 2.5 sq m
C 4.0 sq m
D 6.0 sq m

Answer: 8.0 sq m
11 The measurement is made for stone work in square metre in case of
A Wall facing
B Columns, lintels, copings
C Building work
D A. and D. of the above

Answer: A. and D. of the above
12 The correct Prismoidal formula for volume is
A D/3 [first area + last area + 4 Even area + 2 odd areas]
B D/6 [first area + odd areas]
C D [first area + last area + Even area + 2 odd areas]
D None of above

Answer: D/3 [first area + last area + 4 Even area + 2 odd areas]
13 Pick up the incorrect statement from the following:
A Cubic contents are measured to the nearest 0.1 cum
B Weights are measured to the nearest 0.001 tonnes
C Dimensions are measured to the nearest 0.01 m
D Areas are measured to the nearest 0.01 sq.m

Answer: Cubic contents are measured to the nearest 0.1 cum
14 The order of booking dimensions is
A Height, breadth, length
B Breadth, length, height
C Length, breadth, height
D None of these

Answer: Length, breadth, height
15 period in a septic tank is assumed The detention
A 20 minutes
B 30 minutes
C 40 minutes
D None

Answer: 30 minutes
16 Pick up the item of work not included in the plinth area estimate
A Courtyard area
B Wall thickness
C Room area
D W.C. area

Answer: Courtyard area
17 Pick up the item whose weight is added to the weight of respective item, is
A Bolts
B Cleats
C Brackets
D All the above

Answer: All the above
18 The brick work is measured in sq metre, in case of
A Half brick walls or the partition
B Honey comb brick work
C Brick flat soling
D All the above

Answer: All the above
19 The item of steel work which is measured in sq.m, is
A Ventilators and glazing
B Rolling shutters
C Collapsible gates
D All the above

Answer: All the above
20 The volume is measured correct to the nearest
A 0.04 cum
B 0.02 cum
C 0.03 cum
D 0.01 cum

Answer: 0.01 cum

ADRE 2.0 FULL LENGTH MOCK TEST

Take Mock Tests

Missiles Mock Test Start Test!
SSC MTS Mock Test Start Test
IBPS CLERK MOCK TEST Start Test
SSC MTS 2022 JULY 26 Shift 1 (ENGLISH) Start Test!
SSC GD Previous Year Paper 2021 Nov 17 Shift - I (Hindi) Start Test!
SSC CGL Tier - 1 PYP 2022 April 21 Shift- 1 (ENGLISH) Start Test!
MPSC PAPER I MOCK TEST 1 (ENGLISH) Start Test!
IB Security Assistant Mock test 1 (english) Start Test!
UP POLICE CONSTABLE MOCK TEST 1 Start Test!
DELHI POLICE CONSTABLE MOCK TEST 1 (HINDI) Start Test!
Advertisement
Assam Direct Recruitment Test Series