61 Pick up the correct statement from the following:
A The bending of bars near supports is generally at 45°
B The bent up bars at a support resist the sharing force
C The bent up bars at a support resist the negative bending moment
D All the above

Answer: All the above
62 The reduced levels of points, 30 metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the road 120 in 1, the chainage of the point with no filling or cutting is
A (6 + 12) chains
B (6 + 18) chains
C (6 + 15) chains
D None of these

Answer: (6 + 12) chains
Advertisement
Article and Schedule Quiz Start Test!
DOWNLOAD CURRENT AFFAIRS PDF FROM APP
63 Pick up the correct statement from the following:
A All pipes are measured along the centre line of the pipes in metres
B All pipes and fittings are classified according to their diameters
C The diameter of the pipes is the nominal diameter of internal bore
D All the above

Answer: All the above
64 Pick up the correct statement in case of water supply.
A Pipes are classified according to their sizes and quality
B Cutting through walls and floors are included with the item
C Pipes laid in trenches and pipes fixed to walls are measured separately
D All the above

Answer: All the above
65 The total length of a cranked bar through a distance D. at 45° in case of a beam of effective length L, is
A L + (2 × 0.42 d)
B L – (0.42 d)
C L – (2 × 0.4 d)
D L + 0.42 d

Answer: L + (2 × 0.42 d)
66 If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is
A Bd + Sd2
B ½ (Bd + Sd2)
C B × d – Sd1/2
D B + d + Sd

Answer: Bd + Sd2
67 The minimum width of a septic tank is taken
A 75 cm
B 90 cm
C 70 cm
D 80 cm

Answer: 75 cm
68 For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is
A 0.274 m3
B 0.247 m3
C 0.200 m3
D None of the above

Answer: 0.274 m3