Manual Testing Quiz | Manual Testing Objective Type Questions and Answers

Sports GK Questions and Answers 2024 (Latest Updated)

Awards & Honours GK Questions 2024 (Latest Updated)

Questions
21 Which of the following is not a major task of Exit criteria?
A Logging the outcome of test execution.
B Writing a test summary report for stakeholders.
C Assessing if more tests are needed.
D Checking test logs against the exit criteria specified in test planning.

Answer: Logging the outcome of test execution.
22 Which is the odd one out?
A Client or development side
B Client side
C Beta release
D Beta testing

Answer: Client or development side
Advertisement
Article and Schedule Quiz Start Test!
DOWNLOAD CURRENT AFFAIRS PDF FROM APP
23 ______ is an existing defect that has not yet caused a failure because the conditions that is required to invoke the defect is not meet.
A Latent defect
B Masked defect
C Both of these
D None of these

Answer: Latent defect
24 Top-down Design does not require ______ .
A Loop-invariants
B Modularity
C Flow charting
D Flow charting

Answer: Loop-invariants
25 Which testing cannot be performed by QA Team?
A Fuzz Testing
B Destructive Testing
C End-to-end Testing
D Equivalence Partitioning Testing

Answer: Fuzz Testing
26 STLC is related to which model?
A Spiral Model
B V Model
C RAD Model
D Waterfall Model

Answer: V Model
27 Defects can be found more easily in ________ .
A Top down Integration Testing
B Bottom up Integration Testing
C Sandwich Integration Testing
D Big Bang Testing.

Answer: Bottom up Integration Testing
28 Focus Testing comes under ______.
A Usability Testing
B Component Testing
C Acceptance Testing
D Performance Testing

Answer: Usability Testing
29 Which is not true in case of Unit Testing?
A It is usually conducted by the development team.
B In this tester evaluates if individual units of source code are fit for use.
C It decreases the software development speed
D It can’t be expected to catch every error in a program.

Answer: It decreases the software development speed
30 Which of the following is / are not a Iterative Model?
A V model
B Spiral Model
C Incremental
D RAD

Answer: V model
31 ____________ is done by suddenly increasing the load for a small period of time and observing the behavior of the system.
A Spike Testing
B Load Testing
C Stress Testing
D All of these

Answer: Spike Testing
32 Test plans are based on _______.
A Support Plan
B Business Plan
C Project Plan
D 33

Answer: Project Plan
33 Which is not a part of Decision Table?
A Driver portion
B Action portion
C Condition portion
D Stub portion

Answer: Driver portion
34 Component Drivers are not needed for ______.
A Top Down
B Modified Top Down
C Big-Bang
D Modified Sandwich

Answer: Top Down
35 Coupling and Cohesion is explained by _______ .
A Cause-Effect Graph
B Dependency Matrix
C Structure Graph
D Software Requirement Specification

Answer: Cause-Effect Graph
36 Which is not true in case of Sanity Testing?
A Sanity testing is High Level Testing.
B Sanity testing is a cursory testing.
C Sanity test is usually unscripted.
D Sanity test is a narrow regression testing.

Answer: Sanity testing is High Level Testing.
37 Confidence Testing refers to ________.
A Regression Testing
B Retesting
C Smoke Testing
D None of the above

Answer: Smoke Testing
38 Which of the following is / are not part of Specification Based Testing?
A Data Flow
B Boundary Value Analysis
C Decision Table
D State Transition

Answer: Data Flow
39 Which testing application security has the purpose to prevent problems which may affect the application integrity and stability?
A Fuzz Testing
B Vulnerability Testing
C Ramp Testing
D Penetration Testing

Answer: Vulnerability Testing
40 What is the ratio of effort needed to fixing a defect in Requirement Phase, Design Phase, Coding Phase and Implementing Phase?
A 1:8:12:100
B 1:6:10:1000
C 1:4:7:10
D 1:10:100:1000

Answer: 1:6:10:1000

Random GK Questions

Assam Direct Recruitment Test Series

Teacher Eligibility Test

Assam Direct Recruitment Test Series